Projek

● REFERENCED PORTAL PAGE (02 // PROJEK — PANGKALAN DATA PROJEK RTP 2015–2025)
https://samariang.my/projek/ Route: /projek/ (page-rtp-tracker.php)
Buka Halaman Projek
PLAIN-LANGUAGE USER GUIDE & LIVE VISUAL SECTION REORDERING CONTROLLER

Understanding & Arranging the 02 · Projek Page

A clear, everyday-language guide to all 5 sections (01–05) on the live Projek page (https://samariang.my/projek/ ↗). Drag and drop any section card (using the ⋮⋮ handle or ▲ / ▼ buttons) to immediately rearrange the live section order on the Projek page.

✓ Susunan Langsung Aktif di Halaman Projek
👥 WHO USES THE PROJEK PAGE?
  • Local Residents & Homeowners: Visit to check exactly what infrastructure upgrades (roads, drains, streetlights, suraus, halls) have been completed in their specific kampung or housing estate.
  • Village Committees (JKKK), Mosque/Surau Boards & School PIBGs: Visit to look up official Rural Transformation Programme Monitoring System (RTPMS) project codes, allocations, and implementing agencies (JKR, DBKU, DID, KWB).
  • Researchers, Auditors & Journalists: Visit to inspect the 11-year (2015–2025) annual spending trends, agency distribution, and download the full 222-project ledger as a CSV spreadsheet.
🎯 WHAT IS THE MAIN MESSAGE OF THE PAGE?
  • 1. 100% Audited Physical Completion (222 / 222 SS): Every single one of the 222 RTP projects worth RM62,208,118.30 (RM62.21 Million) between 2015 and 2025 is 100% physically completed on the ground.
  • 2. Executed by 4 Official Technical Agencies: Shows how projects are engineered and supervised by JKR Sarawak (140 projects), DBKU (54 projects), DID Sarawak (27 projects), and Kuching Water Board / KWB (1 project).
  • 3. Open Public Verification by Village & Year: Any citizen can search, filter by their own village or year, switch between visual cards and compact lists, or export the raw data.
🧭 HOW THE PAGE FLOWS (TOP TO BOTTOM)
  • Top (Sections 01–02): Introduces the 222 RTP database with its 4 headline summary boxes (222 Projects, RM62.21M, 4 Agencies, 12+ Villages) followed by the live urgent community notice bar.
  • Middle (Sections 03–04): Displays the 100% completion ring gauge and technical agency progress bars, followed by 2 interactive charts (2015–2025 Annual Allocation Trend & Agency Share).
  • Bottom (Section 05): Provides the full interactive 222-project search and filter directory (by Year, Agency, Village/Taman, Category, Keyword, View Mode, and CSV Export).
📸 PRATONTON LANGSUNG HALAMAN PROJEK
Buka Halaman Langsung (Tab Baharu) ↗
⋮⋮ 01
SECTION 01 · RTP DATABASE HEADER BANNER & 4 HEADLINE SUMMARY BOXES

Jejak Penuh 222 Projek RTP N7 Samariang (2015–2025) · RM62.21 Juta

Breadcrumb · RTPMS Audit Badges · 4 Summary KPI Boxes (222 Projek, RM62.21J, 4 Agensi, 12+ Kampung)
SEKSYEN 01 // #rtp-hero-top
Hero & 4 KPI RTP
🔍 Klik Zum Penuh Seksyen Ini 📸 Pratonton Langsung Seksyen 01
1. WHAT THIS SECTION IS (APAKAH SEKSYEN INI?)

This is the main header banner at the top of the Projek page. It introduces the official 11-year database (2015–2025) of all 222 Rural Transformation Programme (RTP) infrastructure projects supervised by YB Datuk Hajah Sharifah Hasidah across DUN N7 Samariang.

2. WHAT IT DOES (APA FUNGSINYA?)

Summarizes the entire 11-year infrastructure programme in 4 clear numbers right at the top—total completed projects (222), exact financial value (RM62,208,118.30), number of implementing technical agencies (4), and community coverage (12+ kampung and housing zones).

3. WHY IT EXISTS (MENGAPA IA WUJUD?)

Before diving into charts or searching through 222 individual project records, visitors need a clear, trustworthy summary of the overall scale, timeframe, and 100% completion status of the RTP programme in Samariang.

📖 MAKSUD MAKLUMAT & DATA
4. WHAT THE INFORMATION & NUMBERS MEAN FOR USERS
  • Status Badges ("REKOD AUDIT RASMI RTPMS" & "✓ 100% SIAP SEPENUHNYA (SS)"): "RTPMS" stands for the Sarawak Government’s official Rural Transformation Programme Monitoring System, and "SS" (Siap Sepenuhnya) means 100% physically completed on site.
  • Box 1 — Projek Siap (222 Projek · RTP 2015 – RTP 2025): Confirms that 222 separate physical upgrade projects were approved and completed over 11 annual cycles.
  • Box 2 — Nilai Keseluruhan (RM62.21J / RM62,208,118.30): The exact audited sum of public infrastructure funds invested across all 222 projects.
  • Box 3 — Agensi Pelaksana (4 Agensi · JKR · DBKU · DID · KWB): Every project is tendered, engineered, and certified by one of four government technical bodies: Public Works Department (JKR), Kuching North City Hall (DBKU), Department of Irrigation & Drainage (DID), or Kuching Water Board (KWB).
  • Box 4 — Liputan Komuniti (12+ Kampung · Seluruh DUN N7 Samariang): Confirms that projects are distributed fairly across all traditional villages and housing estates in the constituency.
🧩 SENARAI KAD, BUTANG & ELEMEN
5. EVERY CARD, WIDGET & BUTTON INSIDE THIS SECTION
  • Top Breadcrumb & Audit Status Row: Clickable "← Halaman Utama" back-link, page code indicator ("02 · PANGKALAN DATA 222 PROJEK RTP"), and two verification badges.
  • Left Headline & Introduction: States the full scope of the database and the exact RM62,208,118.30 total.
  • Right 2×2 KPI Summary Grid: Four frosted-glass metric boxes with animated number counters for 222 Projects, RM62.21M Total Value, 4 Agencies, and 12+ Villages.
👆 CARA PENGGUNA MENGGUNAKANNYA
6. HOW VISITORS USE & INTERACT WITH THIS SECTION
  • Visitors read the 4 summary boxes on the right to immediately grasp the total number of projects, total funding, and agencies involved.
  • Clicking "← Halaman Utama" in the top-left returns the user to the main portal homepage.
💡 NILAI & MANFAAT KEPADA PENGGUNA
7. HOW THIS SECTION HELPS RESIDENTS & VISITORS
  • Instant Big-Picture Clarity: Gives the exact audited totals down to the sen (RM62,208,118.30) without forcing users to calculate anything themselves.
  • Builds Public Trust: Explains upfront that all 222 projects are officially tracked under RTPMS and executed by government engineering agencies.
⋮⋮ 02
SECTION 02 · LIVE URGENT CIVIC ANNOUNCEMENTS & SCHEDULE BAR

Hebahan Terkini N7 (Bar Pengumuman & Jadual Kaunter Semasa)

Live Notice Bar · Urgent Aid & Counter Schedules · Prev/Next Controls · Direct Action Link
SEKSYEN 02 // #n7CivicNoticeTicker
Notis Segera
🔍 Klik Zum Penuh Seksyen Ini 📸 Pratonton Langsung Seksyen 02
1. WHAT THIS SECTION IS (APAKAH SEKSYEN INI?)

A slim, dark horizontal announcement bar placed right below the RTP hero banner that rotates through active constituency notices, aid counter schedules, and service alerts.

2. WHAT IT DOES (APA FUNGSINYA?)

Keeps residents informed of urgent dates—such as SKAS & E-Dompet Rasmi registration assistance, free university tuition (FTES 2026) briefings, and Pusat Khidmat operating hours—while they browse the RTP project database.

3. WHY IT EXISTS (MENGAPA IA WUJUD?)

Voters and village leaders who come directly to the RTP tracker page to look up a road or drain project still need to see time-sensitive welfare and community announcements.

📖 MAKSUD MAKLUMAT & DATA
4. WHAT THE INFORMATION & NUMBERS MEAN FOR USERS
  • Category Badge ("KEBAJIKAN", "PENDIDIKAN", "OPERASI", "INFRASTRUKTUR"): Shows the topic of each announcement at a glance.
  • Announcement Text & Action Link: Gives the exact schedule or update along with a direct yellow link to open the relevant page.
🧩 SENARAI KAD, BUTANG & ELEMEN
5. EVERY CARD, WIDGET & BUTTON INSIDE THIS SECTION
  • Left Red Label ("HEBAHAN TERKINI N7"): Pulsing indicator for live constituency updates.
  • Center Rotating Message & Right Controls: Displays the notice text, direct action link, and manual ‹ / › arrow buttons.
👆 CARA PENGGUNA MENGGUNAKANNYA
6. HOW VISITORS USE & INTERACT WITH THIS SECTION
  • Hovering or tapping pauses the rotation so users can read comfortably; clicking ‹ or › flips between notices manually.
💡 NILAI & MANFAAT KEPADA PENGGUNA
7. HOW THIS SECTION HELPS RESIDENTS & VISITORS
  • No Missed Community Notices: Keeps urgent aid and service counter schedules visible across the portal.
⋮⋮ 03
SECTION 03 · 100% COMPLETION RING GAUGE & TECHNICAL AGENCY ALLOCATION BARS

Status Penyelesaian Audit RTPMS (222/222 Siap) & Agihan Mengikut Agensi Teknikal

100% Completion Ring Gauge · 222/222 SS · JKR (66.4%) · DBKU (21.0%) · DID & KWB (12.6%)
SEKSYEN 03 // #rtp-infographic-strip
Tolok 100% & 4 Agensi
🔍 Klik Zum Penuh Seksyen Ini 📸 Pratonton Langsung Seksyen 03
1. WHAT THIS SECTION IS (APAKAH SEKSYEN INI?)

An executive visual summary card that pairs a 100% green completion ring gauge on the left with 3 horizontal progress bars on the right showing how the RM62.21 Million budget is divided among Sarawak’s technical engineering agencies.

2. WHAT IT DOES (APA FUNGSINYA?)

Shows at a single glance that 100% of the 222 projects are completed and illustrates which government department handled the largest share of works and funding.

3. WHY IT EXISTS (MENGAPA IA WUJUD?)

Residents often ask which agency is responsible for building and maintaining different types of infrastructure in their area. This visual bar strip clarifies the exact role, project count, and budget share of JKR, DBKU, DID, and KWB.

📖 MAKSUD MAKLUMAT & DATA
4. WHAT THE INFORMATION & NUMBERS MEAN FOR USERS
  • 100% Completion Ring ("222 / 222 Siap (SS)" · RM62.21 Juta): Confirms that there are zero abandoned or stalled RTP projects in N7 Samariang across the 2015–2025 ledger.
  • 1. JKR Sarawak — 140 Projects (66.4% · RM41.32 Million): Handles two-thirds of all RTP funding, focusing on major roads, multipurpose halls, bridges, school structures, and houses of worship.
  • 2. DBKU — 54 Projects (21.0% · RM13.07 Million): Handles municipal upgrades inside Kuching North housing and village zones, including residential lanes, streetlights, and community sports courts.
  • 3. DID & KWB — 28 Projects (12.6% · RM7.82 Million): Consists of 27 Department of Irrigation & Drainage (DID) monsoon drain and flood mitigation projects plus 1 Kuching Water Board (KWB) water supply upgrade.
🧩 SENARAI KAD, BUTANG & ELEMEN
5. EVERY CARD, WIDGET & BUTTON INSIDE THIS SECTION
  • Left Column — Animated 100% Ring Gauge: Displays a circular green progress ring at 100% alongside the "222 / 222 Siap (SS)" counter and RM62.21 Million audited value.
  • Right Column — 3 Agency Progress Bars: Three colour-coded horizontal bars (Red for JKR Sarawak, Navy for DBKU, Green for DID & KWB) showing each agency’s exact project count, percentage share, and RM million total.
👆 CARA PENGGUNA MENGGUNAKANNYA
6. HOW VISITORS USE & INTERACT WITH THIS SECTION
  • When the section scrolls into view, the ring gauge and the 3 horizontal bars smoothly animate to their exact percentages (100%, 66.4%, 21.0%, and 12.6%) so users can visually compare agency workloads.
💡 NILAI & MANFAAT KEPADA PENGGUNA
7. HOW THIS SECTION HELPS RESIDENTS & VISITORS
  • Clear Accountability: Residents immediately see which technical department (JKR, DBKU, or DID/KWB) oversees roads, municipal lanes, or flood drains in Samariang.
⋮⋮ 04
SECTION 04 · INTERACTIVE ANNUAL ALLOCATION CHART (2015–2025) & AGENCY BREAKDOWN CHART

Visualisasi Peruntukan Tahunan RTP (2015–2025) & Pecahan Agensi Pelaksana

Left Chart: Annual RTP Allocation (2015–2025) · Right Chart: Implementing Agency Breakdown
SEKSYEN 04 // #rtp-charts-grid
Carta Tahunan & Agensi
🔍 Klik Zum Penuh Seksyen Ini 📸 Pratonton Langsung Seksyen 04
1. WHAT THIS SECTION IS (APAKAH SEKSYEN INI?)

A side-by-side pair of interactive visual charts: the left chart plots annual RTP allocations year by year from 2015 to 2025, while the right chart visualizes the project distribution across implementing agencies.

2. WHAT IT DOES (APA FUNGSINYA?)

Lets visitors see the year-by-year consistency of development funding across 11 consecutive years and hover or tap on any bar or segment to inspect exact yearly figures.

3. WHY IT EXISTS (MENGAPA IA WUJUD?)

A table of 222 projects makes it hard to see long-term trends. These two charts turn 11 years of financial records into an easy-to-read visual story showing steady, uninterrupted investment in Samariang.

📖 MAKSUD MAKLUMAT & DATA
4. WHAT THE INFORMATION & NUMBERS MEAN FOR USERS
  • Left Chart ("📈 Peruntukan Tahunan RTP 2015 – 2025"): Shows how much RTP funding was channeled into N7 Samariang each year from 2015 through 2025, proving that village development continued every single year.
  • Right Chart ("🏛️ Pecahan Mengikut Agensi Pelaksana"): Visually compares the proportion of projects executed by JKR Sarawak (140), DBKU (54), DID (27), and KWB (1).
🧩 SENARAI KAD, BUTANG & ELEMEN
5. EVERY CARD, WIDGET & BUTTON INSIDE THIS SECTION
  • Left Chart Card (`#n7RtpYearChart`): Interactive Chart.js bar/line canvas showing yearly allocations from RTP 2015 to RTP 2025.
  • Right Chart Card (`#n7RtpAgencyChart`): Interactive Chart.js breakdown canvas showing project distribution across the 4 technical agencies.
👆 CARA PENGGUNA MENGGUNAKANNYA
6. HOW VISITORS USE & INTERACT WITH THIS SECTION
  • Hover over (or tap on mobile) any year bar in the left chart or agency slice in the right chart to view a tooltip with the exact RM amount and project count.
💡 NILAI & MANFAAT KEPADA PENGGUNA
7. HOW THIS SECTION HELPS RESIDENTS & VISITORS
  • Instant Trend Recognition: Helps voters, students, and journalists see 11 years of infrastructure investment in seconds.
⋮⋮ 05
SECTION 05 · INTERACTIVE 222-PROJECT SEARCH, MULTI-FILTER TOOLBAR, VIEW TOGGLE & CSV EXPORT

Direktori Interaktif 222 Projek RTP (Penapis Tahun, Agensi, Kampung, Kategori & Eksport CSV)

11 Year Filter Pills · 4 Agency Pills · Keyword Search · 13 Village Filter · 8 Category Filter · CSV Export · Visual/Compact Cards
SEKSYEN 05 // #rtp-directory-feed
Direktori & Penapis 222 Projek
🔍 Klik Zum Penuh Seksyen Ini 📸 Pratonton Langsung Seksyen 05
1. WHAT THIS SECTION IS (APAKAH SEKSYEN INI?)

The main interactive search engine and project directory of the page. It provides 5 ways to filter the 222 RTP projects, a live counter that recalculates the total number of matching projects and their combined RM value on the fly, a toggle between Visual Cards and Compact List view, a CSV download button, and the project cards feed.

2. WHAT IT DOES (APA FUNGSINYA?)

Allows any resident to find the exact RTP projects built in their own kampung, school, or mosque within seconds, inspect each project’s RTPMS code, allocation, year, and agency, or open its full project dossier.

3. WHY IT EXISTS (MENGAPA IA WUJUD?)

Scrolling through 222 projects manually would take too long. By giving residents one-click filters for their specific village (e.g., Kampung Semariang Batu, Semerah Padi, Taman Sukma, Siol Kandis), year (2015–2025), and category (Drainage, Halls, Roads, Schools, Streetlights), anyone can audit local projects effortlessly.

📖 MAKSUD MAKLUMAT & DATA
4. WHAT THE INFORMATION & NUMBERS MEAN FOR USERS
  • Year Filter Bar ("Semua (222)" + "RTP 2025" down to "RTP 2015"): Lets users view all 222 projects or isolate a single budget year.
  • Agency Filter Bar ("Semua Agensi", "JKR Sarawak (140)", "DBKU (54)", "DID Saliran (27)", "KWB Air (1)"): Filters projects by the government department that built them.
  • Locality Dropdown ("📍 Semua Kampung & Taman"): Lists 13 major village and housing zones across N7 Samariang (Semariang Batu, Semerah Padi 1 & 2, Samariang Jaya, Taman Sukma, Siol Kandis, Astana Lot, Sungai Bedil Besar, Sungai Midin, Kampung Lintang, Kampung Tunku, Demak Baru, Sourabaya Indah, Wawasan Jaya).
  • Infrastructure Category Dropdown ("🏗️ Semua Kategori Infrastruktur"): Filters by 8 practical project types: Drainage & Flood Control, Community Halls, Roads & Lanes, Bridges & Jetties, Sports & Youth, Houses of Worship, Education & Pre-Schools, and Streetlights & Utilities.
  • Live Dynamic Summary Counter ("X Projek Dijumpai · Jumlah: RM Y"): Automatically adds up and displays the exact number of projects and total RM value matching the user’s current filters.
🧩 SENARAI KAD, BUTANG & ELEMEN
5. EVERY CARD, WIDGET & BUTTON INSIDE THIS SECTION
  • Row 1 — 12 Year Filter Pills: Horizontal scrollable buttons for ALL and each year from RTP 2025 to RTP 2015.
  • Row 2 — 5 Agency Filter Pills: Buttons for All Agencies, JKR (140), DBKU (54), DID (27), and KWB (1).
  • Row 3 — Search & Dropdown Control Card: Contains (1) Keyword search box (`#inlineSearchInput`), (2) Village/Taman selector (`#inlineLocalitySelect`), (3) Infrastructure Category selector (`#inlineCategorySelect`), and (4) Gold "Muat Turun CSV" export button.
  • Row 4 — Live Summary & View Mode Bar: Shows the live project/RM counter (`#rtpLiveSummaryText`) on the left and two view-mode buttons on the right: "🖼️ Kad Visual" (Visual Cards) and "📋 Senarai Padat" (Compact List).
  • Row 5 — Interactive Project Cards Feed (`#rtpCardsFeed`) & "Muat Lagi Projek RTP" Button: Displays each project card with its RTPMS code, title, village, year, agency, RM cost, 100% Siap badge, and click-to-inspect dossier action.
👆 CARA PENGGUNA MENGGUNAKANNYA
6. HOW VISITORS USE & INTERACT WITH THIS SECTION
  • Select your village from the "📍 Semua Kampung & Taman" dropdown (or type your kampung/school name in the search box) to immediately see every RTP project completed in your neighbourhood and the total RM spent there.
  • Click any Year pill (e.g., "RTP 2024") or Category option (e.g., "Saliran & Tebatan Banjir") to narrow down the list further.
  • Switch between "🖼️ Kad Visual" for rich illustrated cards or "📋 Senarai Padat" for a fast, table-like checklist.
  • Click any project card to open its detailed project inspection sheet/dossier, or click "Muat Turun CSV" to download the filtered list into Excel.
💡 NILAI & MANFAAT KEPADA PENGGUNA
7. HOW THIS SECTION HELPS RESIDENTS & VISITORS
  • Hyper-Local Transparency: Residents don’t just see constituency-wide totals—they can see the exact projects and exact ringgit amount delivered in their own village.
  • Open Data for Everyone: The one-click CSV export lets journalists, students, and community leaders download and verify the complete dataset offline.