Single RTP Project Dossier

● REFERENCED PORTAL PAGE (02.1 // SINGLE RTP PROJECT DOSSIER — AUDIT PROJEK INDIVIDU)
https://samariang.my/projek-rtp/baik-pulih-dewan-kpg-semariang-baru-fasa-3/ Route: /projek-rtp/{project-slug}/ (single-rtp_project.php)
Buka Contoh Dossier Projek RTP
PLAIN-LANGUAGE USER GUIDE & LIVE VISUAL SECTION REORDERING CONTROLLER

Understanding & Arranging the 02.1 · Single RTP Project Dossier Page

A clear, everyday-language guide to all 6 sections (01–06) on each individual Single RTP Project Dossier page (https://samariang.my/projek-rtp/baik-pulih-dewan-kpg-semariang-baru-fasa-3/ ↗). Drag and drop any section card (using the ⋮⋮ handle or ▲ / ▼ buttons) to immediately rearrange the live section order across all 222 individual RTP project pages.

✓ Susunan Langsung Aktif di Semua 222 Dossier Projek RTP
👥 WHO USES THE SINGLE RTP PROJECT DOSSIER PAGE?
  • Village Residents & Neighbours: Open a specific project page to check the exact budget, contractor procurement method, completion status, and engineering scope of an upgrade in their kampung.
  • JKKK Village Committees, Mosque/Surau Boards & School PIBGs: Use this dossier to copy the official RTPMS reference code, print a PDF project summary for committee meetings, or request follow-up maintenance.
  • Auditors, Journalists & Researchers: Inspect the 3-phase visual documentation (Before, During, Completed), the 5-stage project lifecycle timeline, and the GIS zone investment totals.
🎯 WHAT IS THE MAIN MESSAGE OF THE PAGE?
  • 1. Complete Project-Level Accountability: Every single one of the 222 RTP projects has its own dedicated audit page—nothing is hidden behind summary numbers.
  • 2. End-to-End Lifecycle Tracking (Past → Present → Future): Shows how a project moves from a grassroots JKKK request to engineering BQ, physical construction, active community use, and ongoing maintenance.
  • 3. Direct Citizen Feedback Loop: Includes a built-in button that pre-fills the project’s RTPMS code and village name so residents can easily report maintenance needs to Pusat Khidmat N7.
🧭 HOW THE PAGE FLOWS (TOP TO BOTTOM)
  • Top (Sections 01–02): Displays the project title, #Bil number, RTP year, agency, RM allocation, and 100% completion status, followed by the live urgent community notice bar.
  • Main Dossier Column (Sections 03–05): Presents the Hero Visual Showcase + Copyable RTPMS Code + 4-KPI Bento Strip (Section 03), the 3-Phase Before/During/Completed Gallery (Section 04), and the 5-Stage Project Lifecycle Timeline (Section 05).
  • Right Sidebar & Bottom Nav (Section 06): Shows the interactive Leaflet GIS Zone Map & village investment totals, Citizen Maintenance/Print Actions, 4 Related Projects in the same village, and Prev/Next project navigation.
📸 PRATONTON LANGSUNG DOSSIER PROJEK RTP
Buka Halaman Langsung (Tab Baharu) ↗
⋮⋮ 01
SECTION 01 · INDIVIDUAL PROJECT HEADER BANNER, STATUS BADGES & HEADLINE METADATA

Header Dossier Audit Projek RTP (#Bil, Tahun, Agensi, Lokasi, Skop & Peruntukan)

Back to 222 RTP Button · Project #Bil Badge · Year & Agency Pill · 100% Siap Badge · Location, Scope & RM Cost
SEKSYEN 01 // #srtp-hero-top
Header Dossier Projek
🔍 Klik Zum Penuh Seksyen Ini 📸 Pratonton Langsung Seksyen 01
1. WHAT THIS SECTION IS (APAKAH SEKSYEN INI?)

The dark executive header banner at the very top of every individual RTP project page. It displays the project’s official serial number (#1 to #222), budget year, implementing technical agency, completion status, full project title, village location, infrastructure category, and approved RM allocation.

2. WHAT IT DOES (APA FUNGSINYA?)

Confirms immediately which specific project the visitor is inspecting, how much it cost, which village it serves, and provides a one-click button to return to the main 222-project directory.

3. WHY IT EXISTS (MENGAPA IA WUJUD?)

When a resident clicks a project from the RTP list or receives a shared link on WhatsApp, they need to see the core facts—Project Name, Village, Category, and RM Amount—clearly at the very top of the page.

📖 MAKSUD MAKLUMAT & DATA
4. WHAT THE INFORMATION & NUMBERS MEAN FOR USERS
  • Project Serial Badge ("DOSSIER AUDIT PROJEK RTP #X"): Identifies the project’s unique number out of the 222 audited projects in N7 Samariang.
  • Year & Agency Pill ("🏛️ RTP 2024 · JKR / DBKU / DID / KWB"): Shows which annual RTP budget funded the project and which technical department supervised it.
  • Completion Status Badge ("✓ 100% SIAP SEPENUHNYA (SS)"): Confirms that physical construction at the site is 100% finished and certified.
  • Location, Scope & Allocation Row: Clearly states the village/taman ("📍 Lokasi"), the type of facility ("🏗️ Skop"), and the exact approved grant in ringgit ("💰 Peruntukan").
🧩 SENARAI KAD, BUTANG & ELEMEN
5. EVERY CARD, WIDGET & BUTTON INSIDE THIS SECTION
  • Top Left Navigation & Dossier Pill: "← Kembali ke Pangkalan Data 222 RTP" button + gold "DOSSIER AUDIT PROJEK RTP #X" badge.
  • Top Right Agency & Completion Badges: Gold badge for RTP Year/Agency and green badge for 100% completion.
  • Main Project Title & 3-Fact Summary Line: Large, readable project title followed by Location, Scope, and RM Allocation.
👆 CARA PENGGUNA MENGGUNAKANNYA
6. HOW VISITORS USE & INTERACT WITH THIS SECTION
  • Read the banner to verify the project’s exact name, village, and approved budget.
  • Click "← Kembali ke Pangkalan Data 222 RTP" anytime to return to the full searchable 222-project directory.
💡 NILAI & MANFAAT KEPADA PENGGUNA
7. HOW THIS SECTION HELPS RESIDENTS & VISITORS
  • Instant Verification: Gives the most important project facts in the first 3 seconds without scrolling.
⋮⋮ 02
SECTION 02 · LIVE URGENT CIVIC ANNOUNCEMENTS & SCHEDULE BAR

Hebahan Terkini N7 (Bar Pengumuman & Jadual Kaunter Semasa)

Live Notice Bar · Urgent Aid & Counter Schedules · Prev/Next Controls · Direct Action Link
SEKSYEN 02 // #n7CivicNoticeTicker
Notis Segera
🔍 Klik Zum Penuh Seksyen Ini 📸 Pratonton Langsung Seksyen 02
1. WHAT THIS SECTION IS (APAKAH SEKSYEN INI?)

A slim horizontal announcement bar right below the project header that rotates through active community notices, aid registration schedules, and Service Centre hours.

2. WHAT IT DOES (APA FUNGSINYA?)

Ensures that residents who open a single project link shared on WhatsApp or Facebook also see important constituency-wide announcements (like SKAS counter days or FTES university aid).

3. WHY IT EXISTS (MENGAPA IA WUJUD?)

Many visitors enter the website directly through a specific village project link. Keeping the notice bar here ensures they never miss urgent welfare or service dates.

📖 MAKSUD MAKLUMAT & DATA
4. WHAT THE INFORMATION & NUMBERS MEAN FOR USERS
  • Category Tag & Notice Text: Shows the topic (Welfare, Education, Operations, Infrastructure) and exact dates/times.
  • Yellow Action Link: Direct shortcut to act on the announcement.
🧩 SENARAI KAD, BUTANG & ELEMEN
5. EVERY CARD, WIDGET & BUTTON INSIDE THIS SECTION
  • Left Red Pulsing Label ("HEBAHAN TERKINI N7"), Center Rotating Message, and Right Action Link + ‹ / › Arrows.
👆 CARA PENGGUNA MENGGUNAKANNYA
6. HOW VISITORS USE & INTERACT WITH THIS SECTION
  • Hover or tap to pause the notice bar; click ‹ or › to flip through notices manually.
💡 NILAI & MANFAAT KEPADA PENGGUNA
7. HOW THIS SECTION HELPS RESIDENTS & VISITORS
  • Keeps Every Visitor Connected: Urgent community schedules stay visible even on deep project pages.
⋮⋮ 03
SECTION 03 · HERO VISUAL SHOWCASE, COPYABLE RTPMS AUDIT CODE BAR & 4-METRIC BENTO STRIP

Kad Visual Utama Projek, Kod Rasmi Audit RTPMS & 4 Kotak Spesifikasi Kontrak

1200×630 Zoomable Visual · Copy RTPMS Code Button · Copy Link Button · 4 Contract KPI Boxes
SEKSYEN 03 // #srtp-showcase-card
Visual, Kod RTPMS & 4 KPI
🔍 Klik Zum Penuh Seksyen Ini 📸 Pratonton Langsung Seksyen 03
1. WHAT THIS SECTION IS (APAKAH SEKSYEN INI?)

The primary audit card at the top of the main dossier column. It combines a large zoomable visual showcase (site photo or architectural scope blueprint), an official Rural Transformation Programme Monitoring System (RTPMS) code bar with one-click copy buttons, and a 4-box contract specification grid.

2. WHAT IT DOES (APA FUNGSINYA?)

Lets users inspect the visual representation of the project in full screen, copy the official government RTPMS audit code or page URL with one click, and verify the exact financial, agency, procurement, and audit status details.

3. WHY IT EXISTS (MENGAPA IA WUJUD?)

Village leaders (JKKK) and auditors frequently need the exact RTPMS reference code and procurement method (e.g., Cabut Undi / Tender) when writing official letters or checking government records.

📖 MAKSUD MAKLUMAT & DATA
4. WHAT THE INFORMATION & NUMBERS MEAN FOR USERS
  • Visual Source Badge ("📷 Foto Tapak Rasmi" or "📐 Visual Skop Kategori"): Transparently tells the user whether the image shown is an uploaded site photo or an architectural engineering diagram for that infrastructure category.
  • Kod Rasmi Audit RTPMS: The unique official tracking code assigned to this project in the Sarawak Government’s RTPMS database.
  • KPI Box 1 — Peruntukan Diluluskan: Exact approved grant amount (RM) and RTP budget year.
  • KPI Box 2 — Agensi Pelaksana & Penyelia: Short code and full official name of the supervising technical department (e.g., Jabatan Kerja Raya Sarawak).
  • KPI Box 3 — Kaedah & Status Perolehan: Explains how the contractor was appointed (e.g., Cabut Undi / Sebut Harga) and whether procurement is completed.
  • KPI Box 4 — Status Pelaksanaan Semasa: Confirms "✓ Siap Sepenuhnya" and the audit code "SS (100% Selesai)".
🧩 SENARAI KAD, BUTANG & ELEMEN
5. EVERY CARD, WIDGET & BUTTON INSIDE THIS SECTION
  • Top Visual Showcase Frame: Large 16:9 image with high-contrast status pills at the top and a "🔍 Besarkan Visual (1200×630)" lightbox zoom button at the bottom.
  • Middle RTPMS Code Bar: Displays the full uncut monospace RTPMS code on the left and two action buttons on the right: "📋 Salin Kod RTPMS" (Copy Code) and "🔗 Salin Pautan" (Copy Page Link).
  • Bottom 4-Metric Bento Grid: Four side-by-side specification cards for Approved Allocation, Implementing Agency, Procurement Method, and Current Execution Status.
👆 CARA PENGGUNA MENGGUNAKANNYA
6. HOW VISITORS USE & INTERACT WITH THIS SECTION
  • Click the main image or the "🔍 Besarkan Visual" button to open the full-screen image lightbox.
  • Click "📋 Salin Kod RTPMS" to copy the project’s official government ID to your clipboard, or click "🔗 Salin Pautan" to share this project page on WhatsApp.
💡 NILAI & MANFAAT KEPADA PENGGUNA
7. HOW THIS SECTION HELPS RESIDENTS & VISITORS
  • Zero Truncation or Jargon: Full RTPMS codes and full agency names are spelled out clearly and can be copied in one click.
⋮⋮ 04
SECTION 04 · 3-PHASE VISUAL DOCUMENTATION GALLERY (BEFORE · DURING · COMPLETED)

Dokumentasi Visual 3 Fasa (Fasa 01 Sebelum · Fasa 02 Semasa · Fasa 03/04 Siap & Kini)

Phase 01: Site Survey & Location · Phase 02: Engineering Scope · Phase 03/04: 100% Completed & Handover · Lightbox Zoom
SEKSYEN 04 // #srtp-gallery-card
Galeri 3 Fasa
🔍 Klik Zum Penuh Seksyen Ini 📸 Pratonton Langsung Seksyen 04
1. WHAT THIS SECTION IS (APAKAH SEKSYEN INI?)

A 3-column visual gallery card that documents the physical progression of the project across three distinct stages: (1) Fasa 01 · Sebelum (Initial Site Survey & Community Location), (2) Fasa 02 · Semasa (Engineering Specification & Physical Construction Scope), and (3) Fasa 03/04 · Siap & Kini (100% Completion & Community Handover).

2. WHAT IT DOES (APA FUNGSINYA?)

Shows visitors the before, during, and completed stages side by side, automatically displaying smart engineering diagrams whenever a historical site photo for an older phase has not yet been uploaded.

3. WHY IT EXISTS (MENGAPA IA WUJUD?)

Residents want to understand the physical transformation of a project from initial site inspection with the JKKK to engineering works and final handover to the village.

📖 MAKSUD MAKLUMAT & DATA
4. WHAT THE INFORMATION & NUMBERS MEAN FOR USERS
  • Card 1 — FASA 01 · SEBELUM ("Pelan Tinjauan Tapak & Lokasi Komuniti"): Documents the joint site inspection between the local JKKK committee and technical officers from JKR/DBKU/DID before works began.
  • Card 2 — FASA 02 · SEMASA ("Spesifikasi Kejuruteraan & Skop Fizikal"): Illustrates the technical engineering scope for this category and procurement method.
  • Card 3 — FASA 03/04 · SIAP & KINI ("Pengesahan Siap 100% & Penyerahan Komuniti"): Confirms that the completed facility has been certified and handed over for residents to use.
🧩 SENARAI KAD, BUTANG & ELEMEN
5. EVERY CARD, WIDGET & BUTTON INSIDE THIS SECTION
  • Section Header: Explains the 3-phase visual documentation gallery and how category engineering diagrams act as fallbacks.
  • 3 Clickable Phase Cards (`.rtp-gallery-3grid`): Each card features a stage badge ("FASA 01", "FASA 02", "FASA 03/04"), a photo/blueprint indicator badge, title, and plain-language explanation.
👆 CARA PENGGUNA MENGGUNAKANNYA
6. HOW VISITORS USE & INTERACT WITH THIS SECTION
  • Click any of the 3 phase cards to open a large lightbox view of that stage’s photo or engineering plan along with its full caption.
💡 NILAI & MANFAAT KEPADA PENGGUNA
7. HOW THIS SECTION HELPS RESIDENTS & VISITORS
  • Clear Visual Storytelling: Breaks down construction into 3 intuitive stages (Before, During, Completed) that any resident can understand at a glance.
⋮⋮ 05
SECTION 05 · 5-STAGE PROJECT LIFECYCLE TIMELINE (PAST → PRESENT → FUTURE)

Garis Masa Pelaksanaan & Kitaran Hayat 5 Peringkat (Masa Lalu → Masa Kini → Masa Hadapan)

100% Lifecycle Progress Bar · Step 01: JKKK Request · Step 02: Engineering BQ · Step 03: Site Construction · Step 04: Active Use · Step 05: Future Maintenance
SEKSYEN 05 // #srtp-timeline-card
Garis Masa 5 Peringkat
🔍 Klik Zum Penuh Seksyen Ini 📸 Pratonton Langsung Seksyen 05
1. WHAT THIS SECTION IS (APAKAH SEKSYEN INI?)

A step-by-step vertical timeline card that explains the complete 5-stage journey of the project—from how it was first proposed by the village committee in the past, to its active operation today, and how it is monitored and maintained in the future.

2. WHAT IT DOES (APA FUNGSINYA?)

Educates residents on how an RTP project actually happens step by step (Steps `01` to `05`), and shows a colour-coded overall lifecycle progress bar at the top.

3. WHY IT EXISTS (MENGAPA IA WUJUD?)

Many citizens wonder how village projects are chosen, who prepares the engineering specs, who inspects the finished work, and what happens after a project is completed. This 5-step timeline demystifies the entire government process in plain Malay.

📖 MAKSUD MAKLUMAT & DATA
4. WHAT THE INFORMATION & NUMBERS MEAN FOR USERS
  • Step 01 — MASA LALU · SUKU 1 ("Permohonan Komuniti JKKK, Tinjauan Tapak & Kelulusan Peruntukan"): How the local JKKK proposed the need to YB Hasidah’s Service Centre, followed by the joint technical site visit and budget approval.
  • Step 02 — MASA LALU · SUKU 2 ("Penyediaan Spesifikasi Kejuruteraan BQ & Proses Perolehan"): How the technical agency (JKR/DBKU/DID/KWB) prepared the Bill of Quantities (BQ) and appointed a qualified contractor.
  • Step 03 — MASA LALU · SUKU 3–4 ("Pelaksanaan Kerja Fizikal di Tapak & Pengesahan Audit Siap"): On-site construction and final engineering inspection certifying 100% completion (SS).
  • Step 04 — MASA KINI · STATUS SEMASA ("Penyerahan Kemudahan & Impak Langsung Kepada Penduduk"): Current active use of the upgraded facility by residents and families in the village.
  • Step 05 — MASA HADAPAN · FASA PASCA-SIAP ("Pemantauan Berkala JKKK, Penyelenggaraan Aset & Cadangan Fasa Susulan"): Ongoing asset monitoring and how residents can request repairs or Phase 2 extensions.
🧩 SENARAI KAD, BUTANG & ELEMEN
5. EVERY CARD, WIDGET & BUTTON INSIDE THIS SECTION
  • Top Lifecycle Progress Bar: Shows "Fasa 4/5 · Beroperasi Penuh (100% Siap)" with a full-width gradient progress bar.
  • 5 Connected Timeline Cards (`01` to `05`): Each step has a numbered circle marker (`01`–`05`), an era badge (`⏪ MASA LALU`, `🟢 MASA KINI`, `🔭 MASA HADAPAN`), a status tag (`✓ Selesai`, `★ Beroperasi Aktif`, `Pemantauan Berterusan`), and a clear paragraph populated with this project’s exact village, agency, RM amount, and RTPMS code.
👆 CARA PENGGUNA MENGGUNAKANNYA
6. HOW VISITORS USE & INTERACT WITH THIS SECTION
  • Read down from Step 01 to Step 05 to see the full history, current status, and future maintenance plan for this specific facility.
💡 NILAI & MANFAAT KEPADA PENGGUNA
7. HOW THIS SECTION HELPS RESIDENTS & VISITORS
  • Explains How Grassroots Requests Become Reality: Shows residents that RTP projects start from their own village JKKK proposals and continue to be monitored even after completion.
⋮⋮ 06
SECTION 06 · STICKY GIS ZONE MAP, CITIZEN ACTION CENTER, RELATED VILLAGE PROJECTS & PREV/NEXT NAV

Peta Lokasi Zon GIS, Ringkasan Pelaburan Kampung, Saluran Maklum Balas & Projek Berkaitan

Leaflet GIS Zone Map · Village Total RM Box · Report Maintenance CTA · Print PDF Button · 4 Related Projects · Prev/Next Project Cards
SEKSYEN 06 // #srtp-sidebar-and-nav
Peta Zon, Tindakan & Projek Berkaitan
🔍 Klik Zum Penuh Seksyen Ini 📸 Pratonton Langsung Seksyen 06
1. WHAT THIS SECTION IS (APAKAH SEKSYEN INI?)

The right-hand companion column (plus the bottom Prev/Next project navigator) that places this individual project inside the broader context of its village and gives residents direct action buttons.

2. WHAT IT DOES (APA FUNGSINYA?)

Shows where the village zone sits on an interactive map of N7 Samariang, calculates how many total RTP projects and how much total RM have been invested in this specific village, lets residents submit a maintenance request or print the dossier as a PDF, and links to 4 related projects in the same area.

3. WHY IT EXISTS (MENGAPA IA WUJUD?)

When inspecting one project in a village (for example, a drain upgrade in Kampung Semariang Batu), residents naturally want to know: "Where is this zone, how much total funding has our village received, what other projects were built nearby, and how do I report if this facility needs maintenance?"

📖 MAKSUD MAKLUMAT & DATA
4. WHAT THE INFORMATION & NUMBERS MEAN FOR USERS
  • Widget 1 — Peta Lokasi Zon & Ringkasan Pelaburan Kampung: Displays an interactive OpenStreetMap + GeoJSON boundary map pinned to the project’s zone, plus the total number of completed RTP projects and combined RM investment in that specific village.
  • Widget 2 — Tindakan Rakyat & Audit Awam ("Saluran Maklum Balas & Dokumen"): Provides a direct button to report maintenance needs or propose a follow-up phase at Pusat Khidmat (automatically attaching the project’s RTPMS code and village name in the URL), plus a one-click Print / Save PDF button.
  • Widget 3 — Projek Berkaitan di Kawasan Sama: Lists up to 4 other completed RTP projects in the same village or infrastructure category, complete with #Bil number, year, agency, and RM cost.
  • Bottom Bar — Sequential Project Navigator (`← Projek RTP Sebelumnya` / `Projek RTP Seterusnya →`): Lets users flip directly to the previous (#Bil - 1) or next (#Bil + 1) project in the 222-project ledger.
🧩 SENARAI KAD, BUTANG & ELEMEN
5. EVERY CARD, WIDGET & BUTTON INSIDE THIS SECTION
  • Interactive Map Card (`#rtpSingleProjectMap`): 230px Leaflet GIS map with N7 Samariang boundary overlay, zone pin, village total project count, village total RM allocation, and a "Tapis Semua Projek di [Kampung] →" shortcut link.
  • Citizen Action Card: Gold button "🛠️ Lapor Penyelenggaraan / Cadangan Susulan →" and outline button "🖨️ Cetak / Simpan Ringkasan Dossier (PDF)".
  • Related Projects Card: Up to 4 clickable mini-cards (`.rtp-related-mini-card`) with thumbnail, #Bil, year, agency, RM amount, and title.
  • Bottom Prev/Next Navigation Cards (`.rtp-single-seq-nav`): Two large footer cards linking to the previous and next RTP projects.
👆 CARA PENGGUNA MENGGUNAKANNYA
6. HOW VISITORS USE & INTERACT WITH THIS SECTION
  • Click "Tapis Semua Projek di [Kampung] →" under the map to view every single RTP project ever built in that village.
  • Click "🛠️ Lapor Penyelenggaraan / Cadangan Susulan →" to open the Pusat Khidmat form with this project’s reference code already filled in.
  • Click "🖨️ Cetak / Simpan Ringkasan Dossier (PDF)" to print a clean hardcopy for JKKK or community meetings.
  • Click any of the 4 related project mini-cards or the bottom Previous/Next cards to continue exploring other RTP projects.
💡 NILAI & MANFAAT KEPADA PENGGUNA
7. HOW THIS SECTION HELPS RESIDENTS & VISITORS
  • Turns Static Data Into Action: Residents can immediately request maintenance or propose a Phase 2 upgrade for that exact site without having to re-type project codes.
  • Shows Total Village Benefit: Proves how multiple RTP projects work together to upgrade an entire neighbourhood.